Work breakdown structure (WBS) can also be said as a hierarchical tree structure.
It outlines the project and breaks it down into smaller and more manageable portions.It is a key project need which organizes the team's work into manageable sections.
It is Detailing or arranging by providing a systematic division to a project
Steps in which WBS is carried out.
- Project deliverable
Sub-deliverable
- Work packages,
Sub work packages &
- Activities
Project:
Overall scope of the project :- The scope of the project which we are going to perform.
Deliverable
Major physical components :- The resources and the machinery required for the project
Work packages:
Sub-division of deliverable into work groups :-The work to be provided to the divisions/ teams
Activities:
Discrete work steps :- The activities which are to be done.
![]() |
| WBS model for construction of residential project |